An Ambitious Set of Requirements

The Pernessy neighbourhood was ultimately included in the first phase of the implementation of Le Mont-sur-Lausanne’s new neighbourhood plans. This green light was granted on the condition that it would serve as the pilot project, with ambitious requirements in terms of architecture, environmental standards and innovative mobility.

With the support of specialised consultancies, we prepared a comprehensive dossier in close collaboration with the municipal authorities. The many exchanges that took place throughout the process resulted, during the public consultation phase, in:

  • A very positive reception from both the authorities and local residents.
  • A limited number of objections, all resolved in a constructive spirit.

And above all, an effective start to construction well ahead of the originally planned schedule.

Architecture & Landscape

We worked with landscape architects to encourage the integration of biodiversity within the neighbourhood, while also ensuring high-quality shared spaces for future residents.

Environmental Performance

Thanks to geothermal energy, free cooling technologies and shared solar panels, all new homes meet Minergie-P standards.

Innovative Mobility

Historically, the neighbourhood plan, as originally defined in the early 2000s, provided for two parking spaces per dwelling. However, under the current VSS standards, each dwelling may now benefit from a maximum of one parking space only, creating an inconsistency.

To reconcile these two requirements, we allocated one parking space to each dwelling, with the remaining spaces made available for rent. Their management is ensured by the condominium association (PPE), and should any spaces remain vacant, they may be restored to their original condition.

To encourage sustainable mobility, Mobility car-sharing vehicles will be made available, together with shared cargo bikes. In addition, a mobility voucher of CHF 5,000 per household was offered towards the purchase of an electric bicycle.

Our Long-Term Vision

Careful preparation, a clear land strategy and a trusted partnership with the municipality can accelerate projects, even in complex contexts.

If construction is progressing today and the residences are beginning to take shape, it is above all thanks to our approach based on listening, dialogue and a long-term vision.

This is how we help bring the neighbourhoods of tomorrow to life.